Gedaan met laden. U bevindt zich op: Validation of the HIC rain gauges data : year 2024
Validation of the HIC rain gauges data : year 2024
This report summarizes the results of the validation of the data recorded during the year 2024 by 19 rain gauges operated by HIC. This validation is made by RMI and integrates two aspects. First, a human operator routinely monitors the data on successive periods of 24 hours. Issues detected on that daily timeframe are directly corrected. Second, monthly and annual values from the validated HIC data are compared against neighboring stations data as well as radar-derived rainfall estimates. Both validation aspects are treated in this report.

Lees de publicatie
- Publicatiedatum
- Oktober 2025
- Publicatietype
- Rapport
- Thema's
- Beleid en onderzoek mobiliteit en openbare werken
- Auteur(s)
- M. Journée, S. Van Goethem
- Reeks
- FH reports PA027_30